March 25, 2025
By:
Walter G. Wright
Category:
Arkansas Environmental, Energy, and Water Law
Arkansas Environmental, Energy, and Water Law
Download PDF
The Alabama Department of Environmental Management (“ADEM”) and Pinnacle Manufacturing, LLC (“Pinnacle”) entered into a March 5th Consent Order (“CO”) addressing alleged violations of the Alabama Hazardous Waste regulations. See Consent Order No. 24-XXX-CHW.
The CO provides that Pinnacle operates a specialty tank and container manufacturing facility in Marshall County, Alabama.
The facility’s operations qualify it as a large quantity generator of hazardous waste as defined in ADEM Admin Code Div. 14.
A representative of ADEM’s Industrial Hazardous Waste Branch conducted an inspection of the facility on May 7, 2024. The inspection and a review of the facility’s compliance is stated to have indicated the following:
- Failure to make a waste determination on solvent-contaminated personal protective equipment and paint-related debris found in the general trash.
- Storage of hazardous waste in the secondary containment system for Plant #2 Paint Kitchen for more than 90 days without a permit.
- Failure to comply with the following:
- Keep on file a written assessment reviewed and certified by qualified professional engineer attesting to the integrity of the secondary containment system located in Plant # 2 Paint Kitchen.
- Inspect at least once each operating day, above ground portions of the tank system, if any to detect corrosion or release of waste.
- Failure to mark or label the secondary containment system located in Plant # 2 Kitchen with the words “Hazardous Waste” and the EPA hazardous waste numbers.
- Failure to mark or label the secondary containment system located in Plant # 2 Kitchen with an indication of the hazards of the contents.
- Failure to provide for review inventory logs, monitoring equipment, or other records to demonstrate that hazardous waste had been emptied from the secondary containment system located in Plant # 2 Kitchen within 90 days of it entering the system.
- Failure to conduct weekly inspections of the central hazardous waste accumulation areas in Plant # 1 Paint Kitchen, Plant # 1 Dress Out, and Plant # 2 Paint Kitchen.
- Failure to post “No Smoking” signs at the central hazardous waste accumulation areas.
- Failure to have secondary containment systems for the central hazardous accumulation areas.
- Failure to maintain an impervious coating on the floor of the central hazardous waste accumulation areas in Plant # 1Paint Kitchen, Plant # 1 Dress Out, and Plant # 2 Paint Kitchen.
- Failure to adequately restrict access to the central hazardous waste accumulation areas in Plant # 1 Paint Kitchen, Plant # 1 Dress Out, and Plant # 2 Paint Kitchen.
- Failure to post “Danger – Unauthorized Personnel Keep Out” signs at the previously-referenced areas.
- Failure to mark containers of hazardous waste in the previously referenced hazardous waste accumulation areas with accumulation start dates.
- Failure to label containers of hazardous waste in the previously referenced accumulation areas with the words “Hazardous Waste”.
- Failure to mark containers of hazardous waste in the previously referenced hazardous waste accumulation areas with an identification of the hazards.
- Failure to mark or label containers of hazardous waste in the previously referenced accumulation areas with the appropriate EPA hazardous waste numbers.
- Failure to keep closed containers of hazardous waste in Plant # 1 Paint Kitchen, Plant # 1 Dress Out, and Plant # 2 Paint Kitchen.
- Failure to maintain aisle space for inspections and movement of emergency equipment in central hazardous waste accumulation area.
- Failure to mark or label satellite accumulation containers with the words “Hazardous Waste”.
- Failure to mark or label satellite accumulation containers with an indication of the hazards of its contents.
- Failure to keep closed multiple satellite accumulation containers of hazardous waste.
- Failure to provide for review documentation that hazardous waste management training had been provided to an employee that handles hazardous waste.
- Failure to provide for review job titles for each position that handles hazardous waste.
- Failure to provide for review job descriptions for each position that handles hazardous waste.
- Failure to provide for review written descriptions of the type and amount of training needed for each employee that handles hazardous waste.
- Failure to provide for review the final signed manifest for multiple shipments of hazardous waste.
- Failure to provide for review documentation that the facility’s contingency plan and all revisions had been submitted to all local emergency responders.
- Failure to provide for review documentation that the facility had developed a quick reference guide for their contingency plan and that a copy had been sent to all local emergency responders.
Pinnacle neither admits nor denies ADEM’s contentions.
A civil penalty of $29,080.00 is assessed.
A copy of the CO can be downloaded here.
The Between the Lines blog is made available by Mitchell, Williams, Selig, Gates & Woodyard, P.L.L.C. and the law firm publisher. The blog site is for educational purposes only, as well as to give general information and a general understanding of the law. This blog is not intended to provide specific legal advice. Use of this blog site does not create an attorney client relationship between you and Mitchell Williams or the blog site publisher. The Between the Lines blog site should not be used as a substitute for legal advice from a licensed professional attorney in your state.