The Federal Highway Administration (“FHWA”)issued a Notice of Proposed Rulemaking (“NPRM”) which would establish regulations setting minimum standards and requirements for projects funded under the National Electric Vehicle Infrastructure (NEVI) Formula Program. See Docket No. FHWA-2022-0008.
The standards and requirements in the NPRM would apply to the:
. . . installation, operation, or maintenance of EV charging infrastructure; the interoperability of EV charging infrastructure; traffic control device or on-premises signage acquired, installed, or operated in concert with EV charging infrastructure; data, including the format and schedule for the submission of such data; network connectivity of EV charging infrastructure; and information on publicly available EV charging infrastructure locations, pricing, real-time availability, and accessibility through mapping applications.
The FHWA states the minimum standards are intended to help ensure that the national EV charging network is user-friendly, reliable, and accessible to all Americans. In other words, the apparent intent is to attempt to ensure that, regardless of the type of EV driven, state in which a user is located, or charging company that is utilized, there is a unified network of chargers with similar payment systems, pricing information, charging speeds, etc. This is stated to align with the Biden Administration’s commitment to accelerate the construction of a national network of 500,000 electric vehicle chargers by 2030.
The FHWA notes that the Bipartisan Infrastructure Law requires that minimum standards and requirements be developed related to six areas:
- Installation, operation, and maintenance by qualified technicians of electric vehicle infrastructure
- Interoperability of electric vehicle charging infrastructure
- Traffic control devices and on-premise signs acquired, installed, or operated
- Data requested related to a project funded under the NEVI formula program, including the format and schedule for submission of such data
- Network connectivity of electric vehicle charging infrastructure
- Information on publicly available electric vehicle charging infrastructure locations, pricing, real-time availability, and accessibility through mapping applications
The Bipartisan Infrastructure Law included two programs with a total of $7.5 billion in dedicated funding that is intended to facilitate access to electric vehicle chargers and alternative fueling facilities to all Americans for long-distance trips.
A copy of the NPRM can be downloaded here.
The Between the Lines blog is made available by Mitchell, Williams, Selig, Gates & Woodyard, P.L.L.C. and the law firm publisher. The blog site is for educational purposes only, as well as to give general information and a general understanding of the law. This blog is not intended to provide specific legal advice. Use of this blog site does not create an attorney client relationship between you and Mitchell Williams or the blog site publisher. The Between the Lines blog site should not be used as a substitute for legal advice from a licensed professional attorney in your state.