The Arkansas Department of Energy & Environment – Division of Environmental Quality (“ADEQ”) and M&S Properties, LLC (“M&S”) entered into an April 15th Consent Administrative Order (“CAO”) addressing alleged violations of Clean Water Act General Stormwater Permits. See LIS 24-063.
The CAO provides that M&S operates a construction site and concrete storage and loading facility (“Facility”) in Farmington, Arkansas.
M&S activities are stated to fall within the definition of “construction activities” in Part I, Section A of the NPDES Stormwater Construction General Permit (“Construction Permit”). Further, the CAO provides that M&S is required to have permit coverage for stormwater discharges associated with construction activities.
M&S activities at the site are also stated to fall within the definition of “industrial activities” in Part I, Section A of the NPDES Stormwater Industrial General Permit (“Industrial Permit”). Therefore, M&S is stated to have been required to have permit coverage for stormwater discharges associated with industrial activities.
DEQ is stated to have conducted a construction stormwater inspection of the Facility on April 24, 2023. The inspection is alleged to have identified the following:
- Respondent is constructing a Parking lot and office building at the Facility.
- Respondent is operating under automatic coverage of the Construction PermitSmall Site Construction Stormwater General Permit, ARR 150000.
- The Stormwater Pollution Prevention Plan (SWPPP) did not contain a site map, in violation of Part 11, Section A, Subsection 2, Item B of the Construction Permit.
- Stormwater inspection records were not present, in violation of Part II, Section A, Subsection 4, Item N.3 of the Construction Permit.
DEQ on April 26, 2023, conducted a reconnaissance inspection of the industrial activity at the Facility. The inspection is stated to have identified the following:
- Respondent is using the Facility for storing and loading concrete and related materials.
- Preexisting concrete mixing infrastructure was present, though M&S stated that all mixing activity occurred off-site.
- Activity at the Facility requires coverage under the Industrial Permit – Industrial Stormwater General Permit, ARR000000.
- M&S is operating without Industrial Permit coverage, in violation of Ark. Code Ann. § 8-4-217(b)(1)(C).
DEQ is stated to have provided the results of the inspections to M&S and requested written responses. Neither inspection response is stated to have been submitted.
The CAO requires that on or before its effective date M&S must submit a Notice of Intent and any associated permit fees to DEQ for coverage under the Industrial Permit. Further, M&S is required to comply with the Industrial Stormwater General Permit until DEQ issues a Notice of Coverage. In addition, written responses to DEQ’s submissions are required on or before the effective date of the CAO.
M&S is also required to comply with the NPDES Stormwater Construction General Permit including all Stormwater Pollution Prevention Plan and recordkeeping requirements. Monthly progress reports are required.
A civil penalty of $3,800 is assessed which could have been reduced to one-half if the CAO was signed and returned to DEQ within 20 calendar days of its receipt.
A copy of the CAO can be downloaded here.
The Between the Lines blog is made available by Mitchell, Williams, Selig, Gates & Woodyard, P.L.L.C. and the law firm publisher. The blog site is for educational purposes only, as well as to give general information and a general understanding of the law. This blog is not intended to provide specific legal advice. Use of this blog site does not create an attorney client relationship between you and Mitchell Williams or the blog site publisher. The Between the Lines blog site should not be used as a substitute for legal advice from a licensed professional attorney in your state.